Surya,
1. Create integration model for stock for that material/plant in ECC
2. Activate the integration model in ECC
3. Create stock in ECC. It will automagically replicate in APO.
All the above assumes that you have already established connectivity, and all required ECC and SCM integration configuration has already been done and debugged.
Best Regards,
DB49